Expert geotechnical advice and design
Expert geotechnical advice and design
CLIENT: HYDO TASMANIA
PROJECT:
POATINA POWER STATION CAVERN STABILITY
PROJECT PERIOD: 2021
The aim of the project was to undertake a three-dimensional numerical assessment to provide a state-of the-art geotechnical assessment of the cavern stability and ground support performance at the Poatina Power Station.